FTTh Urban - UK

Key Project Info

Timeframe
Apr '21 - Dec '21
Country:
United Kingdom
Services:
High Level Design, Detailed Design
Volume:
50,000 Homes Passed
Tools:
Visio, Qfield, QGIS

Description

  • This project was the FTTH network deployment across the city based on the proposed route in HLD. ​
  • Key considerations at the LLD stage were PDP locations, existing infrastructure routes (BT).
  • There were also significant physical boundaries such as roads, rivers, railways, and natural features. ​
  • This project required great attention to details as it was essential to use available infrastructure and to avoid new trenching as much as possible.
  • If there was no available option then the priority would be proposing new poles.
No items found.

Highlights

Civil Works

Hybrid Network

Cascade